The Golden Eagle is the second largest Oilfield in the UK, located North of Aberdeen. Construction works included a wellhead platform (WHP) and a process utility and quarters platform (PUQ), along with a bridge to connect them.
Ductform participated in the construction works by Manufacturing over 100 tonnes of fully welded HVAC Ductwork, fabricated from 3mm Stainless Steel Sheet.